FR Cloud ST (2009 plans)

  • Weekly ST : 50 jobs per site - all sites involved
 LPSC : ready to be tested but only 16 DS available
 BEIJING : Validation on-going - Available DS on MCDISK 68 
  • Optimization and Site Stress test: On demand and dedicated to sites which are interrested.
GRIF : GRIFOPN test (as soon as it is available) Total of 1000 jobs will
be distributed to ATLAS CEs with following DS available being accessed
from LAL, SACLAY and LPNHE
       - GRIF-SACLAY_MCDISK: 332
       - GRIF-LPNHE_MCDISK: 334
       - GRIF-LAL_MCDISK: 457
LPC : to be planned when new storage arrays installation and network  
      upgrade done
      DS available on IN2P3-LPC_MCDISK: 326
LAPP-CPPM : interrested by a stress test ~130 DS available there
TOKYO : Input DS available on TOKYO-LCG2_MCDISK: 1000