Atlas:Analysis Challenge
02/12/08 : E.Lançon, F.Chollet (Thanks to Cédric Serfon)
Sommaire
Information & Contact
Mailing list ATLAS-LCG-OP-L@in2p3.fr
Goals
- measure "real" analysis job efficiency and turn around on several sites of a given cloud
- measure data access performance
- check load balancing between different users and different analysis tools (Ganga vs pAthena)
- check load balancing between analysis and MC production
Required services @ T1 and GRIF
- LFC catalog : lfc-prod.in2p3.fr
- ATLAS Disk space : ATLASUSERDISK on T1 SE (fail-over for outputs in case of problems with T2 disk storage)
- GRIF and CC-IN2P3 TOP BDII : should be available as they are used remotely by some sites
FR Cloud ST (2009 plans)
- Weekly ST : 50 jobs per site
- Optimization and Site Stress test: On demand and dedicated to sites which are interrested.
GRIF : GRIFOPN test (as soon as it is available) Total of 1000 jobs will be distributed to ATLAS CEs with following DS available being accessed from LAL, SACLAY and LPNHE - GRIF-SACLAY_MCDISK: 332 - GRIF-LPNHE_MCDISK: 334 - GRIF-LAL_MCDISK: 457 LPC : to be planned when new storage arrays installation and network upgrade done DS available on IN2P3-LPC_MCDISK: 326 LAPP-CPPM : interrested by a stress test ~130 DS available there LPSC : ready to be tested but only 16 DS available TOKYO : Input DS available on TOKYO-LCG2_MCDISK: 1000 BEIJING : Validation on-going - Available DS on MCDISK 68
First exercise on the FR Cloud (December 2008)
Phase 1 : Site stress test oraganized by ATLAS and run centrally in a controlled manner (2 days)
DA challenges have been performed on IT and DE clouds in october 08. Proposition has been made to extend this cloud-by cloud challenge to the FR Cloud. See ATLAS coordination DA challenge meeting (Nov. 20)
First exercise will help to identify breaking points and bottlenecks. It is limited in time (a few days) and requires careful attention of site administrators during that period,in particular network (internal & external), disk, cpu monitoring. This first try (Stress tests) can be run centrally in a controlled manner. The testing framework is ganga-based.
- Any site in the Tiers_of_ATLAS list can participate.
- ATLAS coordination : Dan van der Ster and Johannes Elmsheuser
- Details of Site Stress test : procedure, test conditions and targets
- GlueCEPolicyMaxCPUTime >= 1440 (1 day , typical duration : 5 hours)
- Jobs run under DN : /O=GermanGrid/OU=LMU/CN=Johannes_Elmsheuser
- Results available here : http://gangarobot.cern.ch/st/
- Test 43 - Nov. 28 http://gangarobot.cern.ch/st/test_43/
- Test 61 - December 8-10 http://gangarobot.cern.ch/st/test_61/
Sites: IN2P3-LPC, GRIF-LPNHE, TOKYO-LCG2, IN2P3-CPPM Max Jobs Per Site: 300
- Test 62 - December 8-10 http://gangarobot.cern.ch/st/test_62/
Sites: TOKYO Max Jobs Per Site: 300 Input DS Patterns: mc08.*Wmunu*.recon.AOD.e*_s*_r5*tid* mc08.*Zprime_mumu*.recon.AOD.e*_s*_r5*tid* mc08.*Zmumu*.recon.AOD.e*_s*_r5*tid* mc08.*T1_McAtNlo*.recon.AOD.e*_s*_r5*tid* mc08.*H*zz4l*.recon.AOD.e*_s*_r5*tid* mc08.*.recon.AOD.e*_s*_r5*tid*
- Test 82 - December 15-17 http://gangarobot.cern.ch/st/test_82/
ST summary
Phase 2 : Pathena Analysis Challenge
- Data Analysis exercice open to physicists with their favorite application
- Physicists involved : Julien Donini, Arnaud Lucotte, Bertrand Brelier, Eric Lançon, LAL ?, LPNHE ?
Planning
- Dec 8 : stop of MC production
- Dec. 8-9: 1rst round with Tokyo, CPPM, LPC (LAN limited to 1Gbps), GRIF-LPNHE
- Dec 17 : restart of MC production
- Dec 14 : stop of MC production
- Dec. 15-16 : 2nd round with LAPP, CC-IN2P3-T2 (to be confirmed), Tokyo, CPPM, LPC, possibly GRIF (SACLAY, IRFU, LPNHE), RO-07 and RO-02
- Dec 17 : restart of MC production
- Dec 17 : Beginning of Analysis Challenge (Phase 2)
Target and metrics
- Nb of events : Few hundred up to 1000 jobs/site
- Rate (evt/s) : up to 15 Hz
- Efficiency (success/failure rate) : 80 %
- CPU utilization : CPUtime / Walltime > 50 %