the following export rates | the following export rates | ||
− | |SITE |TAPE |DISK |TOTAL | + | {| border="1" |
− | |IN2P3 | 48.00 MB/s | 100.00 MB/s | 148.00 MB/s | | + | |SITE |
+ | |TAPE | ||
+ | |DISK | ||
+ | |TOTAL | ||
+ | |---- | ||
+ | |IN2P3 | ||
+ | | 48.00 MB/s | ||
+ | | 100.00 MB/s | ||
+ | | 148.00 MB/s | ||
+ | |} | ||
Metric for success: Sites should be capable of sustaining 90% of the | Metric for success: Sites should be capable of sustaining 90% of the | ||
Ligne 31: | Ligne 40: | ||
As a reminder, here the table of the necessary space needed at each T1 | As a reminder, here the table of the necessary space needed at each T1 | ||
− | SITE TAPE DISK | + | {|border="1" |
− | IN2P3 12.4416 TB 25.92 TB | + | |SITE |
+ | |TAPE | ||
+ | |DISK | ||
+ | |--- | ||
+ | |IN2P3 | ||
+ | |12.4416 TB | ||
+ | |25.92 TB | ||
+ | |} | ||
=== Logbook === | === Logbook === |
Version du 15:16, 21 mai 2008
Sommaire
T0-T1 transfer tests (week1)
T1-T1 transfer tests (week2)
T0-T1-T2 transfer tests (week3)
General remarks
The T0 load generator will run at "peak" rate for 3 days ("peak" rate means data from 24h/day of detector data taking at 200Hz are distributed in 24h, while "nominal" rate means data from 14 hours/day of detector data taking at 200Hz are distributed in 24h).
At peak rate 17,280,000 events/day are produced, corresponding to 27.6 TB/day of RAW, 17.3 TB/day of ESD and 3.5 TB/day of AOD (considering the sizes of 1.6 MB/event for RAW, 1.0 MB/event for ESD and 0.2 MB/event for AOD)
T0-T1(LYON)
Shipping continuously data to T1s according to computing model, sites should demonstrate to sustain for 3 days the following export rates
SITE | TAPE | DISK | TOTAL |
IN2P3 | 48.00 MB/s | 100.00 MB/s | 148.00 MB/s |
Metric for success: Sites should be capable of sustaining 90% of the mentioned rates (for both disk and tape) for at least 2 days of test. For sites who would like to test higher throughput, we can oversubscribe (both to disk and tape).
As a reminder, here the table of the necessary space needed at each T1
SITE | TAPE | DISK |
IN2P3 | 12.4416 TB | 25.92 TB |
Logbook
- Transfers started at about 13h30.
http://lcg2.in2p3.fr/wiki/images/20080521-1530-LYON.throughput.14400.png
T1-T2
General remarks
T2s will receive AODs, which should be generated at a rate of 3.5TB/day. The amount that each site receives depends on the share as written in https://twiki.cern.ch/twiki/bin/view/Atlas/DDMOperationsGroup#CCRC08_2_May_2008
Logbook
- Transfers started at about 15h10.