Difference between revisions of "French Sites:Xmas"

Un article de lcgwiki.
Jump to: navigation, search
(Tiers-3)
Ligne 31: Ligne 31:
 
* IPHC (IRES)
 
* IPHC (IRES)
 
* IPNL : All ressources for site IPNL will be available during Christmas period (from 22/12/2007 to 03/01/2008) with a minimal support.
 
* IPNL : All ressources for site IPNL will be available during Christmas period (from 22/12/2007 to 03/01/2008) with a minimal support.
 +
* IPSL-IPGP : SE available, CE opened only to dteam and ops VOs (1 WN only) 21/12/07 (incl) to 02/08 (excl). No support to be expected.
  
 
== EGEE sites ==
 
== EGEE sites ==

Version du 13:29, 20 décembre 2007

2007-2008 Planning over Christmas for the french sites Best wishes for 2008 !
Contact our favorite ROC : grid-roc@cc.in2p3.fr
Broadcast/publish informations from the CIC portal : https://cic.in2p3.fr/index.php?section=rc&page=broadcast

Tier-1

  • CC-IN2P3 will be running as usual, except that there will be a minimal support on 24/12, 31/12 and 01/01.
  • ROC support will be organized as follows :
    * on december 24th and 31rst only by grid-roc@cc.in2p3.fr
    * december 26-28,
      mailto: grid-roc@cc.in2p3.fr
      on phone : Pierre-Emmanuel Brinette
    * on January 2 :
      mailto: grid-roc@cc.in2p3.fr
      on phone : Hélène Cordier

Tiers-2

  • GRIF : All ressources for site GRIF will be available during Christmas period.

The support for these sites will be minimal from 22/12/2007 at 9h00(GMT) until 03/01/2008 at 9h00(GMT)

  • LAPP Annecy : All ressources for sites IN2P3-LAPP will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.
  • LPC Clermont : All ressources for sites IN2P3-LPC and AUVERGRID will be avaible normaly during Christmas period. The support for these sites will be minimal from 22/12/2007 at (GMT) until 07/01/2008 at 9h00(GMT)
  • Subatech : All resources for site IN2P3-SUBATECH are available with minimal support between 24/12/2007 and 01/01/2008 included.
  • IN2P3-CC-T2 : As IN2P3-CC (T1), all resources will be available from IN2P3-CC-T2 from 24/12/2007 to 02/01/2008.

Tiers-3

  • CPPM : All ressources for site CPPM will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.
  • IPHC (IRES)
  • IPNL : All ressources for site IPNL will be available during Christmas period (from 22/12/2007 to 03/01/2008) with a minimal support.
  • IPSL-IPGP : SE available, CE opened only to dteam and ops VOs (1 WN only) 21/12/07 (incl) to 02/08 (excl). No support to be expected.

EGEE sites