Difference between revisions of "French Sites:Xmas"
(→Tiers-2) |
|||
Ligne 9: | Ligne 9: | ||
== Tiers-2 == | == Tiers-2 == | ||
− | * GRIF : | + | * GRIF : All ressources for site GRIF will be available during Christmas period. |
− | + | The support for these sites will be minimal from 22/12/2007 at 9h00(GMT) until 03/01/2008 at 9h00(GMT) | |
+ | |||
* LAPP Annecy : All ressources for sites IN2P3-LAPP will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support. | * LAPP Annecy : All ressources for sites IN2P3-LAPP will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support. | ||
Version du 16:43, 18 décembre 2007
2007-2008 Planning over Christmas for the french sites
Contact our favorite ROC : grid-roc@cc.in2p3.fr
Broadcast/publish informations from the CIC portal :
https://cic.in2p3.fr/index.php?section=rc&page=broadcast
Sommaire
Tier-1
- CC-IN2P3 will be running as usual, except that there will be a minimal support on 24/12 and on 31/12.
Tiers-2
- GRIF : All ressources for site GRIF will be available during Christmas period.
The support for these sites will be minimal from 22/12/2007 at 9h00(GMT) until 03/01/2008 at 9h00(GMT)
- LAPP Annecy : All ressources for sites IN2P3-LAPP will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.
- LPC Clermont : All ressources for sites IN2P3-LPC and AUVERGRID will be avaible normaly during Christmas period. The support for these sites will be minimal from 22/12/2007 at (GMT) until 07/01/2008 at 9h00(GMT)
- Subatech : All resources for site IN2P3-SUBATECH are available with minimal support between 24/12/2007 and 01/01/2008 included.
- IN2P3-CC-T2 : As IN2P3-CC (T1), all resources will be available from IN2P3-CC-T2 from 24/12/2007 to 02/01/2008.
Tiers-3
- CPPM : All ressources for site CPPM will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.
- IPHC (IRES)
- IPNL