Difference between revisions of "French Sites:Xmas"

Un article de lcgwiki.
Jump to: navigation, search
Ligne 1: Ligne 1:
__NOTOC__
+
'''2007-2008 Planning over Christmas for the french sites'''
== 2007-2008 Planning over Christmas for the french sites ==
 
  
 
Contact our favorite ROC : <span style="color:#0000F0;">grid-roc@cc.in2p3.fr</span> <br>
 
Contact our favorite ROC : <span style="color:#0000F0;">grid-roc@cc.in2p3.fr</span> <br>
Ligne 26: Ligne 25:
 
== Tiers-3 ==
 
== Tiers-3 ==
 
* CPPM : All ressources for site CPPM will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.
 
* CPPM : All ressources for site CPPM will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.
*
+
* IPHC (IRES)
 +
* IPNL
 +
 
 +
== EGEE sites ==

Version du 15:51, 18 décembre 2007

2007-2008 Planning over Christmas for the french sites

Contact our favorite ROC : grid-roc@cc.in2p3.fr
Broadcast/publish informations from the CIC portal : https://cic.in2p3.fr/index.php?section=rc&page=broadcast

Tier-1

  • CC-IN2P3 will be running as usual, except that there will be a minimal support on 24/12 and on 31/12.

Tiers-2

  • GRIF :
  • LAPP Annecy :

All ressources for sites IN2P3-LAPP will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.

  • LPC Clermont :

All ressources for sites IN2P3-LPC and AUVERGRID will be avaible normaly during Christmas period. The support for these sites will be minimal from 22/12/2007 at (GMT) until 07/01/2008 at 9h00(GMT)

  • Subatech :

All resources for site IN2P3-SUBATECH are available with minimal support between 24/12/2007 and 01/01/2008 included.

  • IN2P3-CC-T2 :

As IN2P3-CC (T1), all resources will be available from IN2P3-CC-T2 from 24/12/2007 to 02/01/2008.

Tiers-3

  • CPPM : All ressources for site CPPM will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.
  • IPHC (IRES)
  • IPNL

EGEE sites