Difference between revisions of "Atlas:Analysis Challenge"
(→Testing framework and conditions) |
(→Testing framework and conditions) |
||
Ligne 23: | Ligne 23: | ||
The testing framework is ganga-based. It is currently using LCG backend but it will soon be possible to use PANDA backend as well. | The testing framework is ganga-based. It is currently using LCG backend but it will soon be possible to use PANDA backend as well. | ||
− | It is possible for sites to limit the number of jobs sent at a time. DA team is open to suggestion and ready to take into | + | It is possible for sites to limit the number of jobs sent at a time. |
+ | DA team is open to suggestion and ready to take into account | ||
+ | site constraints or limitations. | ||
==== 2009 plans ==== | ==== 2009 plans ==== |
Version du 09:48, 21 novembre 2008
Sommaire
ATLAS Analysis challenge
Goals
- measure "real" analysis job efficiency and turn around on several sites of a given cloud
- measure data access performance
- check load balancing between different users and different analysis tools (Ganga vs pAthena)
- check load balancing between analysis and MC production
First exercise on the FR Cloud in december 08 (proposition)
DA challenges have been performed on IT and DE clouds in october 08. Proposition has been made to extend this cloud-by cloud challenge to the FR Cloud. See ATLAS coordination DA challenge meeting (Nov. 20)
First exercise is limited in time (a few days) and requires careful attention of site administrators during that period,in particular network (internal & external), disk, cpu monitoring. It is not a functional test but more a scaling test to identify breaking points and bottleneck in the cloud configuration.
This first try can be run centrally. ATLAS coordination (Dan van der Ster and Johannes Elmsheuser) needs to know which sites to be tested and when. Any site in the Tiers_of_ATLAS list can participate.
Procedure
Testing framework and conditions
The testing framework is ganga-based. It is currently using LCG backend but it will soon be possible to use PANDA backend as well.
It is possible for sites to limit the number of jobs sent at a time. DA team is open to suggestion and ready to take into account site constraints or limitations.
2009 plans
Results
See
- ATLAS Twiki page : https://twiki.cern.ch/twiki/bin/view/Main/GangaSiteTests
- Results of analysis challenge performed on [IT Cloud:http://indico.cern.ch/getFile.py/access?contribId=128&sessionId=8&resId=0&materialId=slides&confId=22137]
- Results of [DE Cloud:http://indico.cern.ch/getFile.py/access?contribId=128&sessionId=8&resId=0&materialId=slides&confId=22137]