Difference between revisions of "Atlas:CCRC08May"
(→T0-T1-T2 transfer tests) |
M |
||
Ligne 1: | Ligne 1: | ||
− | = T0-T1 transfer tests week1 = | + | = T0-T1 transfer tests (week1) = |
− | = T1-T1 transfer tests week2 = | + | = T1-T1 transfer tests (week2) = |
− | = T0-T1-T2 transfer tests week3 = | + | = T0-T1-T2 transfer tests (week3) = |
=== General remarks === | === General remarks === | ||
The T0 load generator will run at "peak" rate for 3 days ("peak" rate | The T0 load generator will run at "peak" rate for 3 days ("peak" rate | ||
Ligne 52: | Ligne 52: | ||
http://lcg2.in2p3.fr/wiki/images/20080521-1530-LYONT2.throughput.14400.png | http://lcg2.in2p3.fr/wiki/images/20080521-1530-LYONT2.throughput.14400.png | ||
− | = T0-T1-T2 + T1-T1 transfer tests week4 = | + | = T0-T1-T2 + T1-T1 transfer tests (week4) = |
Version du 15:09, 21 mai 2008
Sommaire
T0-T1 transfer tests (week1)
T1-T1 transfer tests (week2)
T0-T1-T2 transfer tests (week3)
General remarks
The T0 load generator will run at "peak" rate for 3 days ("peak" rate means data from 24h/day of detector data taking at 200Hz are distributed in 24h, while "nominal" rate means data from 14 hours/day of detector data taking at 200Hz are distributed in 24h).
At peak rate 17,280,000 events/day are produced, corresponding to 27.6 TB/day of RAW, 17.3 TB/day of ESD and 3.5 TB/day of AOD (considering the sizes of 1.6 MB/event for RAW, 1.0 MB/event for ESD and 0.2 MB/event for AOD)
T0-T1(LYON)
Shipping continuously data to T1s according to computing model, sites should demonstrate to sustain for 3 days the following export rates
|SITE |TAPE |DISK |TOTAL | |IN2P3 | 48.00 MB/s | 100.00 MB/s | 148.00 MB/s |
Metric for success: Sites should be capable of sustaining 90% of the mentioned rates (for both disk and tape) for at least 2 days of test. For sites who would like to test higher throughput, we can oversubscribe (both to disk and tape).
As a reminder, here the table of the necessary space needed at each T1
SITE TAPE DISK IN2P3 12.4416 TB 25.92 TB
Logbook
- Transfers started at about 13h30.
http://lcg2.in2p3.fr/wiki/images/20080521-1530-LYON.throughput.14400.png
T1-T2
General remarks
T2s will receive AODs, which should be generated at a rate of 3.5TB/day. The amount that each site receives depends on the share as written in https://twiki.cern.ch/twiki/bin/view/Atlas/DDMOperationsGroup#CCRC08_2_May_2008
Logbook
- Transfers started at about 15h10.
http://lcg2.in2p3.fr/wiki/images/20080521-1530-LYONT2.throughput.14400.png