Difference between revisions of "French Sites:Xmas"
(→Tiers-2) |
|||
Ligne 16: | Ligne 16: | ||
== Tiers-2 == | == Tiers-2 == | ||
− | * GRIF : All ressources for site GRIF will be available during Christmas period. | + | * GRIF : All ressources for site GRIF will be available during Christmas period. The support for these sites will be minimal from 22/12/2007 at 9h00(GMT) until 03/01/2008 at 9h00(GMT) |
− | The support for these sites will be minimal from 22/12/2007 at 9h00(GMT) until 03/01/2008 at 9h00(GMT) | ||
* LAPP Annecy : All ressources for sites IN2P3-LAPP will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support. | * LAPP Annecy : All ressources for sites IN2P3-LAPP will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support. |
Version du 17:56, 20 décembre 2007
2007-2008 Planning over Christmas for the french sites Best wishes for 2008 !
Contact our favorite ROC : grid-roc@cc.in2p3.fr
Broadcast/publish informations from the CIC portal :
https://cic.in2p3.fr/index.php?section=rc&page=broadcast
Sommaire
Tier-1
- CC-IN2P3 will be running as usual, except that there will be a minimal support on 24/12, 31/12 and 01/01.
- ROC support will be organized as follows :
* on december 24th and 31rst only by grid-roc@cc.in2p3.fr * december 26-28, mailto: grid-roc@cc.in2p3.fr on phone : Pierre-Emmanuel Brinette * on January 2 : mailto: grid-roc@cc.in2p3.fr on phone : Hélène Cordier
Tiers-2
- GRIF : All ressources for site GRIF will be available during Christmas period. The support for these sites will be minimal from 22/12/2007 at 9h00(GMT) until 03/01/2008 at 9h00(GMT)
- LAPP Annecy : All ressources for sites IN2P3-LAPP will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.
- LPC Clermont : All ressources for sites IN2P3-LPC and AUVERGRID will be avaible normaly during Christmas period. The support for these sites will be minimal from 22/12/2007 at (GMT) until 07/01/2008 at 9h00(GMT)
- Subatech : All resources for site IN2P3-SUBATECH are available with minimal support between 24/12/2007 and 01/01/2008 included.
- IN2P3-CC-T2 : As IN2P3-CC (T1), all resources will be available from IN2P3-CC-T2 from 24/12/2007 to 02/01/2008.
Tiers-3
- CPPM : All ressources for site CPPM will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.
- IPHC (IRES)
- IPNL : All ressources for site IPNL will be available during Christmas period (from 22/12/2007 to 03/01/2008) with a minimal support.
EGEE sites
- IPSL-IPGP : SE available, CE opened only to dteam and ops VOs (1 WN only) 21/12/07 (incl) to 02/08 (excl). No support to be expected.