Difference between revisions of "French Sites:Xmas"
Jerome PINOT (talk | contribs) (→Tiers-2) |
(→Tiers-2) |
||
Ligne 12: | Ligne 12: | ||
* LAPP Annecy : | * LAPP Annecy : | ||
− | All ressources for sites IN2P3-LAPP will be available during Christmas period with a minimal support. | + | All ressources for sites IN2P3-LAPP will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support. |
* LPC Clermont : | * LPC Clermont : |
Version du 15:23, 18 décembre 2007
2007-2008 Planning over Christmas for the french sites
Contact our favorite ROC : grid-roc@cc.in2p3.fr
Broadcast/publish informations from the CIC portal :
https://cic.in2p3.fr/index.php?section=rc&page=broadcast
Tier-1
- CC-IN2P3 will be running as usual.
Tiers-2
- GRIF :
- LAPP Annecy :
All ressources for sites IN2P3-LAPP will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.
- LPC Clermont :
All ressources for sites IN2P3-LPC and AUVERGRID will be avaible normaly during Christmas period. The support for these sites will be minimal from 22/12/2007 at (GMT) until 07/01/2008 at 9h00(GMT)
- Subatech :
All resources for site IN2P3-SUBATECH are available with minimal support between 24/12/2007 and 01/01/2008 included.
Tiers-3
- CPPM :