Difference between revisions of "French Sites:Xmas"

Un article de lcgwiki.
Jump to: navigation, search
(Tiers-2)
(Tiers-2)
Ligne 18: Ligne 18:
  
 
* Subatech :  
 
* Subatech :  
All resources for site IN2P3-SUBATECH are available with minimal support between /12/2007 and /01/2007.
+
All resources for site IN2P3-SUBATECH are available with minimal support between 24/12/2007 and 01/01/2008 included.
  
 
== Tiers-3 ==
 
== Tiers-3 ==
 
* CPPM :
 
* CPPM :
 
*
 
*

Version du 15:06, 18 décembre 2007

2007-2008 Planning over Christmas for the french sites

Contact our favorite ROC : grid-roc@cc.in2p3.fr
Broadcast/publish informations from the CIC portal : https://cic.in2p3.fr/index.php?section=rc&page=broadcast

Tier-1

  • CC-IN2P3 will be running as usual.

Tiers-2

  • GRIF :
  • LAPP Annecy :

All ressources for sites IN2P3-LAPP will be available during Christmas period with a minimal support.

  • LPC Clermont :

All ressources for sites IN2P3-LPC and AUVERGRID will be avaible normaly during Christmas period. The support for these sites will be minimal from 22/12/2007 at (GMT) until 07/01/2008 at 9h00(GMT)

  • Subatech :

All resources for site IN2P3-SUBATECH are available with minimal support between 24/12/2007 and 01/01/2008 included.

Tiers-3

  • CPPM :