Difference between revisions of "French Sites:Xmas"
(→Planning over Christmas for the french sites (in construction)) |
|||
Ligne 1: | Ligne 1: | ||
__NOTOC__ | __NOTOC__ | ||
− | == | + | == 2007-2008 Planning over Christmas for the french sites == |
Contact our favorite ROC : <span style="color:#0000F0;">grid-roc@cc.in2p3.fr</span> <br> | Contact our favorite ROC : <span style="color:#0000F0;">grid-roc@cc.in2p3.fr</span> <br> | ||
Ligne 10: | Ligne 10: | ||
== Tiers-2 == | == Tiers-2 == | ||
* GRIF : | * GRIF : | ||
− | + | ||
− | + | * LAPP Annecy : | |
− | |||
− | |||
− | |||
* LPC Clermont : | * LPC Clermont : | ||
− | All ressources for sites IN2P3-LPC and AUVERGRID will be avaible normaly during Christmas period. The support for these sites will be minimal from | + | All ressources for sites IN2P3-LPC and AUVERGRID will be avaible normaly during Christmas period. The support for these sites will be minimal from /12/2007 at (GMT) until /01/2008 at 9h00(GMT) |
* Subatech : | * Subatech : | ||
− | All resources for site IN2P3-SUBATECH are available with minimal support between | + | All resources for site IN2P3-SUBATECH are available with minimal support between /12/2007 and /01/2007. |
== Tiers-3 == | == Tiers-3 == | ||
* CPPM : | * CPPM : | ||
− | * | + | * |
− | |||
− |
Version du 11:37, 18 décembre 2007
2007-2008 Planning over Christmas for the french sites
Contact our favorite ROC : grid-roc@cc.in2p3.fr
Broadcast/publish informations from the CIC portal :
https://cic.in2p3.fr/index.php?section=rc&page=broadcast
Tier-1
- CC-IN2P3 will be running as usual.
Tiers-2
- GRIF :
- LAPP Annecy :
- LPC Clermont :
All ressources for sites IN2P3-LPC and AUVERGRID will be avaible normaly during Christmas period. The support for these sites will be minimal from /12/2007 at (GMT) until /01/2008 at 9h00(GMT)
- Subatech :
All resources for site IN2P3-SUBATECH are available with minimal support between /12/2007 and /01/2007.
Tiers-3
- CPPM :