Difference between revisions of "French Sites:Xmas"
(→Tiers-2) |
|||
Ligne 7: | Ligne 7: | ||
== Tier-1 == | == Tier-1 == | ||
− | * CC-IN2P3 will be running as usual. | + | * CC-IN2P3 will be running as usual, except that there will be a minimal support on 24/12 and on 31/12. |
+ | |||
== Tiers-2 == | == Tiers-2 == | ||
* GRIF : | * GRIF : |
Version du 15:47, 18 décembre 2007
2007-2008 Planning over Christmas for the french sites
Contact our favorite ROC : grid-roc@cc.in2p3.fr
Broadcast/publish informations from the CIC portal :
https://cic.in2p3.fr/index.php?section=rc&page=broadcast
Tier-1
- CC-IN2P3 will be running as usual, except that there will be a minimal support on 24/12 and on 31/12.
Tiers-2
- GRIF :
- LAPP Annecy :
All ressources for sites IN2P3-LAPP will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.
- LPC Clermont :
All ressources for sites IN2P3-LPC and AUVERGRID will be avaible normaly during Christmas period. The support for these sites will be minimal from 22/12/2007 at (GMT) until 07/01/2008 at 9h00(GMT)
- Subatech :
All resources for site IN2P3-SUBATECH are available with minimal support between 24/12/2007 and 01/01/2008 included.
- IN2P3-CC-T2 :
As IN2P3-CC (T1), all resources will be available from IN2P3-CC-T2 from 24/12/2007 to 02/01/2008.
Tiers-3
- CPPM : All ressources for site CPPM will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.