Atlas:CCRC08May: Difference between revisions
Ligne 1: | Ligne 1: | ||
= T0-T1-T2 transfer tests | = T0-T1 transfer tests week1 = | ||
= T1-T1 transfer tests week2 = | |||
= T0-T1-T2 transfer tests week3 = | |||
=== General remarks === | |||
The T0 load generator will run at "peak" rate for 3 days ("peak" rate | |||
means data from 24h/day of detector data | |||
taking at 200Hz are distributed in 24h, while "nominal" rate means | |||
data from 14 hours/day of detector data taking | |||
at 200Hz are distributed in 24h). | |||
At peak rate 17,280,000 events/day are produced, corresponding to 27.6 | |||
TB/day of RAW, 17.3 TB/day of ESD and | |||
3.5 TB/day of AOD (considering the sizes of 1.6 MB/event for RAW, 1.0 | |||
MB/event for ESD and 0.2 MB/event for AOD) | |||
== T0-T1(LYON) == | == T0-T1(LYON) == | ||
Shipping continuously data to T1s according to computing model, sites | |||
should demonstrate to sustain for 3 days | |||
the following export rates | |||
|SITE |TAPE |DISK |TOTAL | | |||
|IN2P3 | 48.00 MB/s | 100.00 MB/s | 148.00 MB/s | | |||
Metric for success: Sites should be capable of sustaining 90% of the | |||
mentioned rates (for both disk and tape) | |||
for at least 2 days of test. For sites who would like to test higher | |||
throughput, we can oversubscribe (both to | |||
disk and tape). | |||
As a reminder, here the table of the necessary space needed at each T1 | |||
SITE TAPE DISK | |||
IN2P3 12.4416 TB 25.92 TB | |||
=== Logbook === | |||
* Transfers started at about 13h30. | * Transfers started at about 13h30. | ||
[[Image:20080521-1530-OVERVIEW.throughput.14400.png]] | |||
http://lcg2.in2p3.fr/wiki/images/20080521-1530-LYON.throughput.14400.png | http://lcg2.in2p3.fr/wiki/images/20080521-1530-LYON.throughput.14400.png | ||
Ligne 12: | Ligne 46: | ||
as written in | as written in | ||
https://twiki.cern.ch/twiki/bin/view/Atlas/DDMOperationsGroup#CCRC08_2_May_2008 | https://twiki.cern.ch/twiki/bin/view/Atlas/DDMOperationsGroup#CCRC08_2_May_2008 | ||
=== Logbook === | === Logbook === | ||
* Transfers started at about 15h10. | * Transfers started at about 15h10. | ||
http://lcg2.in2p3.fr/wiki/images/20080521-1530-LYONT2.throughput.14400.png | http://lcg2.in2p3.fr/wiki/images/20080521-1530-LYONT2.throughput.14400.png | ||
= T0-T1-T2 + T1-T1 transfer tests week4 = |
Version du 16:08, 21 mai 2008
T0-T1 transfer tests week1
T1-T1 transfer tests week2
T0-T1-T2 transfer tests week3
General remarks
The T0 load generator will run at "peak" rate for 3 days ("peak" rate means data from 24h/day of detector data taking at 200Hz are distributed in 24h, while "nominal" rate means data from 14 hours/day of detector data taking at 200Hz are distributed in 24h).
At peak rate 17,280,000 events/day are produced, corresponding to 27.6 TB/day of RAW, 17.3 TB/day of ESD and 3.5 TB/day of AOD (considering the sizes of 1.6 MB/event for RAW, 1.0 MB/event for ESD and 0.2 MB/event for AOD)
T0-T1(LYON)
Shipping continuously data to T1s according to computing model, sites should demonstrate to sustain for 3 days the following export rates
|SITE |TAPE |DISK |TOTAL | |IN2P3 | 48.00 MB/s | 100.00 MB/s | 148.00 MB/s |
Metric for success: Sites should be capable of sustaining 90% of the mentioned rates (for both disk and tape) for at least 2 days of test. For sites who would like to test higher throughput, we can oversubscribe (both to disk and tape).
As a reminder, here the table of the necessary space needed at each T1
SITE TAPE DISK IN2P3 12.4416 TB 25.92 TB
Logbook
- Transfers started at about 13h30.
http://lcg2.in2p3.fr/wiki/images/20080521-1530-LYON.throughput.14400.png
T1-T2
General remarks
T2s will receive AODs, which should be generated at a rate of 3.5TB/day. The amount that each site receives depends on the share as written in https://twiki.cern.ch/twiki/bin/view/Atlas/DDMOperationsGroup#CCRC08_2_May_2008
Logbook
- Transfers started at about 15h10.
http://lcg2.in2p3.fr/wiki/images/20080521-1530-LYONT2.throughput.14400.png