Difference between revisions of "French Sites:Xmas"

Un article de lcgwiki.
Jump to: navigation, search
(Tiers-2)
(Tiers-2)
Ligne 17: Ligne 17:
  
 
* LPC Clermont :
 
* LPC Clermont :
All ressources for sites IN2P3-LPC and AUVERGRID will avaible normaly during Christmas period. The support for these sites will be minimal from 22/12/2006 at 12h00(GMT) until 02/01/2007 at 9h00(GMT)
+
All ressources for sites IN2P3-LPC and AUVERGRID will be avaible normaly during Christmas period. The support for these sites will be minimal from 22/12/2006 at 12h00(GMT) until 02/01/2007 at 9h00(GMT)
  
 
* Subatech :
 
* Subatech :

Version du 09:08, 21 décembre 2006

Planning over Christmas for the french sites (in construction)

Contact our favorite ROC : grid-roc@cc.in2p3.fr
Broadcast/publish informations from the CIC portal : https://cic.in2p3.fr/index.php?section=rc&page=broadcast

Tier-1

  • CC-IN2P3 will be running as usual.

Tiers-2

  • GRIF :

During the Xmas period, from the 22/12/2006 at 15h30 (GMT) till the 4/01/2007 at 12hOO (GMT), some GRIF resources will not be available: the CE : node07.datagrid.cea.fr the SE : node12.datagrid.cea.fr the RB  : node04.datagrid.cea.fr This periode will be used as well to upgrade our network.Christine Leroy

  • LPC Clermont :

All ressources for sites IN2P3-LPC and AUVERGRID will be avaible normaly during Christmas period. The support for these sites will be minimal from 22/12/2006 at 12h00(GMT) until 02/01/2007 at 9h00(GMT)

  • Subatech :

Tiers-3

  • CPPM :
  • LAPP : no support from 25/12/2006 to 03/01/2007

It came out the GDB meeting held at CERN Dec. 6th that, at least, ATLAS plans to run over Christmas period. Alice plans to try to continue. Gridservices will be running, Grid on duty will continue. Tiers-1 will in general assume best effort support. Lyon has announced it will be running as usual.Special attention should be payed to the possible unavailability of SEs.