Difference between revisions of "French Sites:Xmas"

Un article de lcgwiki.
Jump to: navigation, search
(Tiers-2)
(Tiers-3)
 
(26 intermediate revisions by 10 users not shown)
Ligne 1: Ligne 1:
__NOTOC__
+
'''2007-2008 Planning over Christmas for the french sites <span style="color:#F00000;"> Best wishes for 2008 !'''<br>
== Planning over Christmas for the french sites (in construction) ==
 
 
 
 
Contact our favorite ROC : <span style="color:#0000F0;">grid-roc@cc.in2p3.fr</span> <br>
 
Contact our favorite ROC : <span style="color:#0000F0;">grid-roc@cc.in2p3.fr</span> <br>
 
Broadcast/publish informations from the CIC portal :  
 
Broadcast/publish informations from the CIC portal :  
https://cic.in2p3.fr/index.php?section=rc&page=broadcast  
+
https://cic.in2p3.fr/index.php?section=rc&page=broadcast
+
 
 
== Tier-1 ==
 
== Tier-1 ==
* CC-IN2P3 will be running as usual.
+
* CC-IN2P3 will be running as usual, except that there will be a minimal support on 24/12, 31/12 and 01/01.
 +
* ROC support will be organized as follows :
 +
    * on december 24th and 31rst only by grid-roc@cc.in2p3.fr
 +
    * december 26-28,
 +
      mailto: grid-roc@cc.in2p3.fr
 +
      on phone : Pierre-Emmanuel Brinette
 +
    * on January 2 :
 +
      mailto: grid-roc@cc.in2p3.fr
 +
      on phone : Hélène Cordier
 +
 
 
== Tiers-2 ==
 
== Tiers-2 ==
* GRIF :
+
* GRIF : All ressources for site GRIF will be available during Christmas period. The support for these sites will be minimal from 22/12/2007 at 9h00(GMT) until 03/01/2008 at 9h00(GMT)
During the Xmas period, from the 22/12/2006 at 15h30 (GMT) till the 4/01/2007 at 12hOO (GMT), some GRIF resources will not be available:
+
the CE : node07.datagrid.cea.fr
+
* LAPP Annecy : All ressources for sites IN2P3-LAPP will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.
the SE : node12.datagrid.cea.fr
 
the RB  : node04.datagrid.cea.fr 
 
This periode will be used as well to upgrade our network.Christine Leroy
 
  
* LPC Clermont :
+
* LPC Clermont : All ressources for sites IN2P3-LPC and AUVERGRID will be avaible normaly during Christmas period. The support for these sites will be minimal from 22/12/2007 at (GMT) until 07/01/2008 at 9h00(GMT)
All ressources for sites IN2P3-LPC and AUVERGRID will be avaible normaly during Christmas period. The support for these sites will be minimal from 22/12/2006 at 12h00(GMT) until 02/01/2007 at 9h00(GMT)
 
  
* Subatech :  
+
* Subatech : All resources for site IN2P3-SUBATECH are available with minimal support between 24/12/2007 and 01/01/2008 included.
All resources for site IN2P3-SUBATECH are available with minimal support between 23/12/2006 and 1/04/2006.
+
 
 +
* IN2P3-CC-T2 : As IN2P3-CC (T1), all resources will be available from IN2P3-CC-T2 from 24/12/2007 to 02/01/2008.
  
 
== Tiers-3 ==
 
== Tiers-3 ==
* CPPM :
+
* CPPM : All resources for site CPPM will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.
* LAPP : no support from 25/12/2006 to 03/01/2007
+
* IPHC (IRES) : All resources for site IRES will be available during Christmas period. Limited support from 21/12/2007 to 03/01/2008 9h00. Only critical security incidents support from 22/12/2007 to 27/12/2007 9h00 (use emergency phone number on GOCDB).
 +
* IPNL : All resources for site IPNL will be available during Christmas period (from 22/12/2007 to 03/01/2008) with a minimal support.
 +
 
 +
== EGEE sites ==
 +
* IPSL-IPGP : SE available, CE opened only to dteam and ops VOs (1 WN only) 21/12/07 (incl) to 02/08 (excl). No support to be expected.
  
''It came out the GDB meeting held at CERN Dec. 6th that, at least, ATLAS plans to run over Christmas period. Alice plans to try to continue. Gridservices will be running, Grid on duty will continue. Tiers-1 will in general assume best effort support. Lyon has announced it will be running as usual.Special attention should be payed to the possible unavailability of SEs. ''
+
* CGG-LCG2 : site will be running at risk (no support to be expected some days). Both Ahmed and Gérard will be at the office from  december 26th to december 28th, and from january 2nd.

Latest revision as of 20:36, 21 décembre 2007

2007-2008 Planning over Christmas for the french sites Best wishes for 2008 !
Contact our favorite ROC : grid-roc@cc.in2p3.fr
Broadcast/publish informations from the CIC portal : https://cic.in2p3.fr/index.php?section=rc&page=broadcast

Tier-1

  • CC-IN2P3 will be running as usual, except that there will be a minimal support on 24/12, 31/12 and 01/01.
  • ROC support will be organized as follows :
    * on december 24th and 31rst only by grid-roc@cc.in2p3.fr
    * december 26-28,
      mailto: grid-roc@cc.in2p3.fr
      on phone : Pierre-Emmanuel Brinette
    * on January 2 :
      mailto: grid-roc@cc.in2p3.fr
      on phone : Hélène Cordier

Tiers-2

  • GRIF : All ressources for site GRIF will be available during Christmas period. The support for these sites will be minimal from 22/12/2007 at 9h00(GMT) until 03/01/2008 at 9h00(GMT)
  • LAPP Annecy : All ressources for sites IN2P3-LAPP will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.
  • LPC Clermont : All ressources for sites IN2P3-LPC and AUVERGRID will be avaible normaly during Christmas period. The support for these sites will be minimal from 22/12/2007 at (GMT) until 07/01/2008 at 9h00(GMT)
  • Subatech : All resources for site IN2P3-SUBATECH are available with minimal support between 24/12/2007 and 01/01/2008 included.
  • IN2P3-CC-T2 : As IN2P3-CC (T1), all resources will be available from IN2P3-CC-T2 from 24/12/2007 to 02/01/2008.

Tiers-3

  • CPPM : All resources for site CPPM will be available during Christmas period (from 22/12/2007 to 07/01/2008) with a minimal support.
  • IPHC (IRES) : All resources for site IRES will be available during Christmas period. Limited support from 21/12/2007 to 03/01/2008 9h00. Only critical security incidents support from 22/12/2007 to 27/12/2007 9h00 (use emergency phone number on GOCDB).
  • IPNL : All resources for site IPNL will be available during Christmas period (from 22/12/2007 to 03/01/2008) with a minimal support.

EGEE sites

  • IPSL-IPGP : SE available, CE opened only to dteam and ops VOs (1 WN only) 21/12/07 (incl) to 02/08 (excl). No support to be expected.
  • CGG-LCG2 : site will be running at risk (no support to be expected some days). Both Ahmed and Gérard will be at the office from december 26th to december 28th, and from january 2nd.