Difference between revisions of "Atlas:SC4-May07"
M (→Logbook) |
M (→T0-T1-T2 tests) |
||
Ligne 1: | Ligne 1: | ||
− | + | = T0-T1-T2 transfer tests = | |
* A new DDM version (called 0.3) is under test. The first goal is to reach a steady transfer from CERN (T0) to T1s. | * A new DDM version (called 0.3) is under test. The first goal is to reach a steady transfer from CERN (T0) to T1s. | ||
* A new Arda monitoring fro DDM 0.3 is accessible at this [http://dashb-atlas-data-test.cern.ch/dashboard/request.py/site address] | * A new Arda monitoring fro DDM 0.3 is accessible at this [http://dashb-atlas-data-test.cern.ch/dashboard/request.py/site address] | ||
Ligne 5: | Ligne 5: | ||
* DDM 0.2 (MC production transfers) and DDM 0.3 (T0_T1-T2 transfers) run concurently. Both use the same FTS instance in LYON. | * DDM 0.2 (MC production transfers) and DDM 0.3 (T0_T1-T2 transfers) run concurently. Both use the same FTS instance in LYON. | ||
− | + | == T0-LYON tests == | |
− | + | === General remarks === | |
* Lyon participated to the T0-T1 test since the beginning (beginning of May). | * Lyon participated to the T0-T1 test since the beginning (beginning of May). | ||
* The main problems was Castor stability at CERN | * The main problems was Castor stability at CERN | ||
* Datasets exists during 24 hours. After 24 hours, the datasets are deleted but not the physical files and the LFC entries. | * Datasets exists during 24 hours. After 24 hours, the datasets are deleted but not the physical files and the LFC entries. | ||
* Files are kept 8 hours in dcache disk area (cleaning managed by dcache team) | * Files are kept 8 hours in dcache disk area (cleaning managed by dcache team) | ||
− | + | === Logbook === | |
* Transfers started mid-April | * Transfers started mid-April | ||
* Status plot with one bin per day (15 May) | * Status plot with one bin per day (15 May) | ||
[[Image:OVERVIEW.throughput.2592000-150507.png]] | [[Image:OVERVIEW.throughput.2592000-150507.png]] | ||
− | + | == LYON-T2 tests == | |
− | + | === General remarks === | |
* A cron script is run from LAPP to request | * A cron script is run from LAPP to request | ||
** transfer of datasets to each T2/T3 site | ** transfer of datasets to each T2/T3 site | ||
** delete files and LFC entries when the dataset transfer is complete or the dataset disappeared (operated by CERN) | ** delete files and LFC entries when the dataset transfer is complete or the dataset disappeared (operated by CERN) | ||
* Files have to be transfered before the files (in LYON) and the datasets (at CERN) disappear. So from time to time, no datasets fullfill these constraints | * Files have to be transfered before the files (in LYON) and the datasets (at CERN) disappear. So from time to time, no datasets fullfill these constraints | ||
− | + | === Logbook === | |
* 12 May First tests of LYON->T2. These tests should not affect T0->T2 transfers (dcache load) | * 12 May First tests of LYON->T2. These tests should not affect T0->T2 transfers (dcache load) | ||
* 15 May: Status plot for (15 May) | * 15 May: Status plot for (15 May) |
Version du 21:30, 15 mai 2007
Sommaire
T0-T1-T2 transfer tests
- A new DDM version (called 0.3) is under test. The first goal is to reach a steady transfer from CERN (T0) to T1s.
- A new Arda monitoring fro DDM 0.3 is accessible at this address
- A Twiki page is maintained for the whole transfers
- DDM 0.2 (MC production transfers) and DDM 0.3 (T0_T1-T2 transfers) run concurently. Both use the same FTS instance in LYON.
T0-LYON tests
General remarks
- Lyon participated to the T0-T1 test since the beginning (beginning of May).
- The main problems was Castor stability at CERN
- Datasets exists during 24 hours. After 24 hours, the datasets are deleted but not the physical files and the LFC entries.
- Files are kept 8 hours in dcache disk area (cleaning managed by dcache team)
Logbook
- Transfers started mid-April
- Status plot with one bin per day (15 May)
LYON-T2 tests
General remarks
- A cron script is run from LAPP to request
- transfer of datasets to each T2/T3 site
- delete files and LFC entries when the dataset transfer is complete or the dataset disappeared (operated by CERN)
- Files have to be transfered before the files (in LYON) and the datasets (at CERN) disappear. So from time to time, no datasets fullfill these constraints
Logbook
- 12 May First tests of LYON->T2. These tests should not affect T0->T2 transfers (dcache load)
- 15 May: Status plot for (15 May)
- First comments (15 May):
- CPPM, LAPP, LAL, SACLAY, LPNHE, LPC : OK
- NIPNE_02, NIPNE_07 : Seems to have network limitations
- TOKYO : Many transfers pending with DDM 0.2. Big fight between both DDM versions
- BEIJING : Problem to get TURL
- First comments (15 May):
- Transfers from LYON to T2s are probably affected by the saturation of the line between Computing Center and the NRD (RENATER node)[link].