Difference between revisions of "Atlas:Functionnal-test-lyon"

Un article de lcgwiki.
Jump to: navigation, search
(Detailed information for participation of the LYONregion to the functionnal test)
(Detailed information for participation of the LYONregion to the functionnal test)
Ligne 5: Ligne 5:
 
* 4 September : DDM parameters for CCPM included (no transfer tested with DDM)
 
* 4 September : DDM parameters for CCPM included (no transfer tested with DDM)
 
* 7 September : No pre test due to problems after recovery of the Lyon Computing Center
 
* 7 September : No pre test due to problems after recovery of the Lyon Computing Center
* 8 September : Lyon is back. New version of DDM installed. Test dataset transfer one site after the other. Test OK for LAL, LAPP, LPC, LPNHE (but quite long for yet unknown reasons like other trafic)
+
* 8 September : Lyon is back. New version of DDM installed. Test dataset transfer one site after the other. Test OK for LAL, LAPP, LPC, LPNHE, SACLAY,TOKYO (but quite long for yet unknown reasons like other trafic). For CPPM, one line is missing in ToA (correction submitted to DDM experts). FTS problem (transfer stays active) for BEIJING (message submitted to LYON and BEIJING)

Version du 15:01, 9 septembre 2006

Detailed information for participation of the LYONregion to the functionnal test

The goal of this test is to check that data produced can be moved between sites (functionnalities are working). It is not a performance measurement yet.

  • 4 September : DDM parameters for CCPM included (no transfer tested with DDM)
  • 7 September : No pre test due to problems after recovery of the Lyon Computing Center
  • 8 September : Lyon is back. New version of DDM installed. Test dataset transfer one site after the other. Test OK for LAL, LAPP, LPC, LPNHE, SACLAY,TOKYO (but quite long for yet unknown reasons like other trafic). For CPPM, one line is missing in ToA (correction submitted to DDM experts). FTS problem (transfer stays active) for BEIJING (message submitted to LYON and BEIJING)