Difference between revisions of "Atlas:CCRC08May"

Un article de lcgwiki.
Jump to: navigation, search
(T1-T2)
(Logbook)
Ligne 53: Ligne 53:
  
 
=== Logbook ===
 
=== Logbook ===
* Transfers started at about 13h30.
+
Since about 16:40 T0-T1 transfers stopped. There are many errors.
 +
<pre>
 +
SOURCE error during PREPARATION phase: [GENERAL_FAILURE]
 +
Error caught in srm::getSrmUser.Error creating statement,
 +
Oracle code: 12537ORA-12537: TNS:connection closed]
 +
Source Host [srm-atlas.cern.ch]
 +
</pre>
 +
 
 +
Transfers started at about 13h30.
 
The overall throughput from T0 is over 1000MB/s.
 
The overall throughput from T0 is over 1000MB/s.
 
Lyon is receiving its share at 100-200 MB/s (verying with time).
 
Lyon is receiving its share at 100-200 MB/s (verying with time).

Version du 16:37, 21 mai 2008

T0-T1 transfer tests (week1)

T1-T1 transfer tests (week2)

T0-T1-T2 transfer tests (week3)

General remarks

https://twiki.cern.ch/twiki/bin/view/Atlas/DDMOperationsGroup#CCRC08_2_May_2008

The T0 load generator will run at "peak" rate for 3 days ("peak" rate means data from 24h/day of detector data taking at 200Hz are distributed in 24h, while "nominal" rate means data from 14 hours/day of detector data taking at 200Hz are distributed in 24h).

At peak rate 17,280,000 events/day are produced, corresponding to 27.6 TB/day of RAW, 17.3 TB/day of ESD and 3.5 TB/day of AOD (considering the sizes of 1.6 MB/event for RAW, 1.0 MB/event for ESD and 0.2 MB/event for AOD)


T0-T1(LYON)

Shipping continuously data to T1s according to computing model, sites should demonstrate to sustain for 3 days the following export rates

SITE TAPE DISK TOTAL
IN2P3 48.00 MB/s 100.00 MB/s 148.00 MB/s

Metric for success: Sites should be capable of sustaining 90% of the mentioned rates (for both disk and tape) for at least 2 days of test. For sites who would like to test higher throughput, we can oversubscribe (both to disk and tape).

As a reminder, here the table of the necessary space needed at each T1

SITE TAPE DISK
IN2P3 12.4416 TB 25.92 TB

Logbook

Since about 16:40 T0-T1 transfers stopped. There are many errors.

SOURCE error during PREPARATION phase: [GENERAL_FAILURE] 
Error caught in srm::getSrmUser.Error creating statement, 
Oracle code: 12537ORA-12537: TNS:connection closed] 
Source Host [srm-atlas.cern.ch]

Transfers started at about 13h30. The overall throughput from T0 is over 1000MB/s. Lyon is receiving its share at 100-200 MB/s (verying with time). the average rate is about 40MB/s to IN2P3-CC_DATADISK and 140MB/s to IN2P3-CC_DATATAPE according to dashb http://dashb-atlas-data-tier0.cern.ch/dashboard/request.py/site?name=LYON. 20080521-1530-OVERVIEW.throughput.14400.png 20080521-1530-LYON.throughput.14400.png

T1-T2

T2s will receive AODs, which should be generated at a rate of 3.5TB/day. The amount that each site receives depends on the share

  • IN2P3-LAPP_DATADISK : 12%
  • IN2P3-CPPM_DATADISK : 5%
  • IN2P3-LPSC_DATADISK : 5 %
  • IN2P3-LPC_DATADISK : 13%
  • GRIF-LAL_DATADISK : 30%
  • GRIF-LPNHE_DATADISK : 15%
  • GRIF-SACLAY_DATADISK : 20 %
  • BEIJING-LCG2_DATADISK : 20 %
  • RO-07-NIPNE_DATADISK : 10%
  • RO-02-NIPNE_DATADISK : 10%
  • TOKYO-LCG2_DATADISK : 50%

as written in https://twiki.cern.ch/twiki/bin/view/Atlas/DDMOperationsGroup#CCRC08_2_May_2008

The shares are decided rather arbitrary according to the free space in ATLASDATADISK. These numers can be raised at a later stage of the test, but at first we would like to be sure everythinig goes well with this rate.


  • Transfers started at about 15h10.

http://lcg2.in2p3.fr/wiki/images/20080521-1530-LYONT2.throughput.14400.png

  • from dq2.log:
    • 2008-05-21 15:00: SubscriptionQueued for dataset ccrc08_run2.016731.physics_A.merge.AOD.o0_r0_t0 (vuid = 6403bd5a-5a71-4732-9a0a-b22b56aef106) to GRIF-LAL_DATADISK and TOKYO-LCG2_DATADISK
    • 2008-05-21 15:00: FileTransferring: 3 files of the dataset ccrc08_run2.016731.physics_A.merge.AOD.o0_r0_t0 (fsize = 3600000000 each) for both TOKYO-LCG2_DATADISK and GRIF-LAL_DATADISK
    • 2008-05-21 15:03: VALIDATED: 3 files of dataset ccrc08_run2.016731.physics_A.merge.AOD.o0_r0_t0 at srm://lcg-se01.icepp.jp
    • 2008-05-21 15:03: FileCopied: 3 files of dataset ccrc08_run2.016731.physics_A.merge.AOD.o0_r0_t0 at TOKYO-LCG2_DATADISK
    • 2008-05-21 15:03: FileDone: 3 files of dataset ccrc08_run2.016731.physics_A.merge.AOD.o0_r0_t0 at TOKYO-LCG2_DATADISK
    • 2008-05-21 15:05: SubscriptionComplete: vuid = 6403bd5a-5a71-4732-9a0a-b22b56aef106 : site = TOKYO-LCG2_DATADISK : dsn = ccrc08_run2.016731.physics_A.merge.AOD.o0_r0_t0 : version = 1
  • FTS channels for LAL are 'Inactive' for 'Pb clim LAL'

T0-T1-T2 + T1-T1 transfer tests (week4)