Atlas:CCRC08May

Un article de lcgwiki.
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

T0-T1 transfer tests (week1)

T1-T1 transfer tests (week2)

T0-T1-T2 transfer tests (week3)

General remarks

The T0 load generator will run at "peak" rate for 3 days ("peak" rate means data from 24h/day of detector data taking at 200Hz are distributed in 24h, while "nominal" rate means data from 14 hours/day of detector data taking at 200Hz are distributed in 24h).

At peak rate 17,280,000 events/day are produced, corresponding to 27.6 TB/day of RAW, 17.3 TB/day of ESD and 3.5 TB/day of AOD (considering the sizes of 1.6 MB/event for RAW, 1.0 MB/event for ESD and 0.2 MB/event for AOD)


T0-T1(LYON)

Shipping continuously data to T1s according to computing model, sites should demonstrate to sustain for 3 days the following export rates

SITE TAPE DISK TOTAL
IN2P3 48.00 MB/s 100.00 MB/s 148.00 MB/s

Metric for success: Sites should be capable of sustaining 90% of the mentioned rates (for both disk and tape) for at least 2 days of test. For sites who would like to test higher throughput, we can oversubscribe (both to disk and tape).

As a reminder, here the table of the necessary space needed at each T1

SITE TAPE DISK
IN2P3 12.4416 TB 25.92 TB

Logbook

  • Transfers started at about 13h30.

The overall throughput from T0 is over 1000MB/s. Lyon is receiving its share at 100-200 MB/s (verying with time).

T1-T2

T2s will receive AODs, which should be generated at a rate of 3.5TB/day. The amount that each site receives depends on the share as written in https://twiki.cern.ch/twiki/bin/view/Atlas/DDMOperationsGroup#CCRC08_2_May_2008


  • Transfers started at about 15h10.

http://lcg2.in2p3.fr/wiki/images/20080521-1530-LYONT2.throughput.14400.png

T0-T1-T2 + T1-T1 transfer tests (week4)