Difference between revisions of "Atlas:3T1"
Ligne 27: | Ligne 27: | ||
* '''Common activities related to the Analysis Farm''' | * '''Common activities related to the Analysis Farm''' | ||
*: ''Goal'': identify the required services and infrastructure needs for setting up an Atlas analysis farm | *: ''Goal'': identify the required services and infrastructure needs for setting up an Atlas analysis farm | ||
− | *: ''Contact persons'': Ghita Rahal (CC-IN2P3) | + | *: ''Contact persons'': Ghita Rahal (CC-IN2P3), TBD (US Atlas), TBD (GridKa). |
+ | *: ''Coordinator'': to be identified | ||
*: ''Estimated timeframe'': Atlas-France has no plans for doing this before summer | *: ''Estimated timeframe'': Atlas-France has no plans for doing this before summer | ||
*: ''Status'': | *: ''Status'': |
Latest revision as of 21:43, 28 juin 2007
Introduction
This section contains information on the common activities of the Atlas peer tier-1 associated to the LCG-France tier-1, namely the US Atlas computing facility and GridKa.
Meetings
- The first face-to-face meeting of representatives of the 3 Atlas tier-1 sites was hosted by CC-IN2P3 on May 22nd-23rd 2007. The agenda of the meeting can be found at http://indico.in2p3.fr/conferenceDisplay.py?confId=212. At the end of this meeting a set of possible common activities were identified (see below).
Common activities
- Modify the network routing
- Goal: use the LHCOPN for data exchanges between the 3 sites
- Status: Done on early June 2007.
- Exercise disk-to-disk data exchanges between the 3 sites
- Goal: exercise the disk-based data exchange infrastructure between the 3 sites and make sure the required data rates are reached.
- Contact persons: Ghita Rahal (CC-IN2P3), Hironori Ito (US Atlas), Cédric Serfon and John Kennedy (GridKa).
- Coordinator: Hironori Ito (US Atlas)
- Estimated timeframe: end of june, so that the results of this exercise can be used as an input for the Full Dress Rehearsal
- Status:
- Reconstruction exercise (after the previous disk-to-disk exercise is performed)
- Goal: Tape-to-disk data staging and distribution to other sites
- Contact persons: Ghita Rahal (CC-IN2P3), TBD (US Atlas), TBD (GridKa).
- Coordinator: to be identified (Eric Lançon is in charge of this).
- Estimated timeframe: September-October 2007
- Status:
- Common activities related to the Analysis Farm
- Goal: identify the required services and infrastructure needs for setting up an Atlas analysis farm
- Contact persons: Ghita Rahal (CC-IN2P3), TBD (US Atlas), TBD (GridKa).
- Coordinator: to be identified
- Estimated timeframe: Atlas-France has no plans for doing this before summer
- Status:
Communication channel
A mail distribution list was setup with representatives of the sites and the Atlas experiments. To post messages to this list use the address lcg-atlas-3t1-l@in2p3.fr. Note that you need to be a subscriber to be allowed to post messages to this list.